FTA'S 7th Annual Workshop

SSO Community

New Start Update

2002 Service and Safety Data

Internal Safety Audit Process

FRA Waiver Process

SSO Community Contacts

 

 

FTA's 7th Annual SSO Workshop

  


The 7th Annual State Safety Oversight Workshop, October 19th - 22nd, 2003, in Dallas, TX, brought together - for the first time - all major stakeholders in the rail safety oversight community.  The Federal Transit Administration (FTA), Office of Safety and Security, sponsored the event which included representatives from state oversight agencies, rail transit agencies, FTA regional and headquarter offices, and key officials from the National Transportation Safety Board (NTSB), the Federal Railroad Administration (FRA), and the Transportation Security Administration (TSA).

 

The Workshop was hosted by the Texas Department of Transportation and supported by the Dallas Area Rapid Transit (DART) System.  Representatives from 22 of the 28 (22 existing and 6 new states) state oversight agencies participated in the event; four of the state oversight agencies represented were newly designated agencies.  In the first year of rail transit agency participation, 21 agencies of the 47 (37 existing and 10 new starts) invited were represented at the Workshop.  Several attendees convened on Sunday to tour the DART system preceding the start of the formal Annual Workshop Sessions.

 

This year's Workshop marked the introduction of training for state officials, as FTA conducted a special session on the safety certification process.  FTA began the session by providing an overview of the safety certification process, based on its Handbook for Transit Safety and Security Certification. The remainder of the Monday session included presentations by Workshop attendees outlining their agency's experiences implementing the certification process.  The information shared during this session's discussion was valuable for all participating agencies.

 

Safety managers from the nation's rail transit agencies joined the Workshop on Tuesday, October 21st.  The 2nd day of the Workshop focused on FTA safety and security initiatives planned and currently underway including fatigue management, the Drug and Alcohol Program, and FTA's Top 20 Security Action Items and website. The program for Wednesday, October 22nd included presentations and open discussions on the Internal Safety Audit Process as well as a presentation of the Federal Railroad Administration waiver process, as it pertains to state safety oversight.

 

The 7th Annual Workshop provided a valuable opportunity for FTA, state oversight agencies, rail transit agencies, and the other participating agencies, such as NTSB, FRA, and TSA.  Aside from providing attendees with educational presentations, the Workshop connected agencies in a manner that encouraged the transfer of helpful information such as best practices and reference materials as well as providing FTA with valuable input from SSO community members.

 

 

SSO Community


As reported to FTA in 2003, 22 State oversight agencies implemented 49 CFR Part 659 requirements for 37 rail transit agencies, including 12 heavy rail systems, 26 light rail systems, and 9 other rail systems  (4 automated guideway / monorail systems, 4 inclined plane systems and 1 cable car system).

 

FTA Region

State

SOA

Agency

RFGS

Mode

1

MA

DTE

Department of Telecommunication & Energy

Massachusetts BayTransit Authority

HR, LR

2

NJ

NJDOT

New Jersey Department of Transportation

Hudson-Bergen Light Rail System

LR

New JerseyTransit

LR

Port Authority Transit Corporation

HR

NY

PTSB

New YorkPublic Transportation Safety Board

New York CityTransit

HR

NiagaraFrontier Transit Authority

LR

3

DC/VA/     MD

TOC

Tri-State Oversight Committee

WashingtonMetropolitan Area Transit Authority

HR

MD

MDOT

Maryland Department of Transportation

MarylandTransit Administration

HR, LR

PA

PennDOT

Pennsylvania Department of Transportation

Southeastern PennsylvaniaTransit Authority

HR, LR

Port Authority of Allegheny County

LR, IP, IP

Cambria County Transit Authority

IP

4

FL

FDOT

Florida Department of Transportation

Metro-Dade Transit Authority

HR, AG

JacksonvilleTransportation Authority

AG

Hillsborough Area Regional Transit

LR

GA

GDOT

GeorgiaDepartmentof Transportation

Metropolitan Atlanta Rapid Transit Authority

HR

TN

TDOT

Tennessee Department of Transportation

ChattanoogaArea Rapid Transit Authority

IP

MemphisArea Transit Authority

LR

5

IL

RTA

Regional Transit Authority

ChicagoTransit Authority

HR

MI

CIS

Michigan Department of Consumer & Industry Services

DetroitPeople Mover

AG

DetroitDowntown Trolley

LR

OH

ODOT

Ohio Department of Transportation

Greater Cleveland Regional Transit Authority

HR, LR

WI

WisDOT

Wisconsin Department of Transportation

KenoshaTransit

LR

6

LA

LADOTD

Louisiana Department of Transportation and Development

New OrleansRegional Transit Authority

LR

TX

TxDOT

Texas Department of Transportation

GalvestonIslandTransit

LR

DallasArea Rapid Transit

LR

7

IL

SCCTD

St. Clair County Transit District

Bi-State Development Agency

LR

MO

MCRS

MissouriMotor Carrier and Rail Safety

8

CO

CPUC

ColoradoPublic Utilities Commission

Denver Regional Transit District

LR

UT

UDOT

Utah Department of Transportation

UtahTransit Authority

LR

9

CA

CPUC

CaliforniaPublic Utilities Commission

Bay Area Rapid Transit

HR

Los AngelesCountyMetropolitan Transportation Authority

HR, LR

San FranciscoMunicipal Railway

LR, LR, CC

San Diego Trolley, Inc.

LR

Sacramento Regional Transit District

LR

Santa ClaraValleyTransit Authority

LR

10

OR

ODOT

Oregon Department of Transportation

PortlandTri-Met

LR

WA

WDOT

Washington Department of Transportation

King County Metro

LR

SeattleCenterMonorail

AG

HR = Heavy Rail; LR = Light Rail; IP = Inclined Plane; AG = Automated Guideway


 

New Start Update


In 2003, the State Safety Oversight (SSO) community continued to grow, with 6 new oversight agencies in various phases of designation, and 10 new start rail transit agencies underway.

 

Upcoming Additions to the SSO Community: 2003 to 2006

Location Project Date of Service* Weekday Ridership* SOA
Tacoma, WA Tacoma Link Light Rail 8/2003 2,000 Washington State Department of Transportation (WSDOT)
San Juan, PR Tren Urbano 12/2003 113,300 Puerto Rico State Emergency and Disaster Management Agency (PREMA)
Houston, TX Houston MetroRail 1/2004 40,000 Texas Department of Transportation (TxDOT)
Las Vegas, NV Las Vegas, Resort Corridor Fixed Guideway 1/2004 38,800 Nevada Department of Transportation (NDOT)
Camden, NJ Southern New Jersey Light Rail 12/2004 8,500 New Jersey Department of Transportation (NJDOT)
Little Rock, AK Central Arkansas Transit Authority River Rail Project 9/2004 1,000 Arkansas State Highway and Transportation Department (AHTD)
Minneapolis, MN Metro Transit Hiawatha Corridor Light Rail Transit 12/2004 19,300 Minnesota Department of Public Safety/State Patrol (DPS)
San Diego, CA North County Transit District Sprinter 12/2004 16,000 California Public Utilities Commission (CPUC)
Charlotte, NC Charlotte Area Transit System South Corridor Fall 2006 21,100 North Carolina Department of Transportation, Rail Division (NCDOT)
Phoenix, AZ Regional Public Transportation Authority East Valley Corridor 12/2006 48,000 Arizona Department of Transportation (ADOT)
*projected BOLD - New Oversight Agency

 


Transit Agency Map

 

 

2002 Service and Safety Data

 

 


Annual Unlinked Passenger Trips: 1999 to 2002

Mode

1999

2000

2001

2002

Heavy Rail

2,609,453,900

2,604,328,600

2,656,231,300

2,650,694,300

Light Rail

278,102,600

298,372,100

315,725,820

317,601,400

Other*

19,375,800

19,769,400

20,458,080

20,029,900

Total

2,906,932,300

2,922,470,100

2,992,415,200

2,988,325,600

*includes automated guideways, inclined planes, monorails, and cable cars

 

The following analyses have been compiled from the State Safety Oversight Program's annual reporting process.  The safety data presented below were extracted from State Oversight Agency submissions of the Annual Reporting Template - 2002.

 

Service Data-

 

In 2002, the 37 rail transit agencies affected by 49 CFR Part 659 experienced a slight decrease in ridership, reversing a trend of growing ridership.

 

This decrease is largely attributed to economic downturns affecting several major metropolitan areas.  The above service data were
extracted from the American Public Transportation Association's (APTA) ridership reports and FTA inquiry.


 


Safety Data-

 

FTA's State Safety Oversight Rule (49 CFR Part 659.45) requires that SOAs must submit to FTA an annual report summarizing oversight activities for the preceding twelve months, including accident, injury, and fatality figures for all applicable transit agencies which they oversee.  In 1999, FTA developed an Annual Reporting Template to facilitate the collection of data in a format that could be easily quantified at year's end. The following safety data was taken from the Annual Report submissions since 1999 and offer a four-year picture of patterns and trends in reported safety data.

 

In 2002, heavy rail and "other” rail modes experienced a decrease in injury rates for the second straight year.  Heavy rail's rate decreased by 12% and "other" rail's rate decreased by 49%.  The 2002 light rail service injury rate was 20% higher than its mark four years earlier.  The 2002 injury rate (14.11 per 10M trips) measured higher than heavy rail for the first time since 1999.  The other rail service injury rate for 2002 of 2.00 injuries per 10M trips was a four-year low.

 

The overall increase in injuries incurred by light rail service over the past four years may be attributed to increases in the reporting of single person accidents, such as slips, trips, and falls and trespassing-related incidents.  The single-person accident injury rate for light rail has increased over the past four years as the mode's collision injury rate over the same period has decreased.

Injury Rates by Mode: 1999 - 2002

injury rates by mode:  1999 - 2002

Light Rail Injury Rates: 1999 - 2002

light rail injury rates: 1999 - 2002

(per 10M passenger trips)

Rail Grade Crossings

 

Unlike heavy rail systems, which operate largely within exclusive right-of-ways, the majority of light rail transit systems operate portions of their systems within exclusive right-of-ways on city streets, in mixed traffic, within median strips in city streets, and in pedestrian malls. This situation frequently results in numerous, roadway-light rail grade crossings.  In some cases, light rail systems share grade crossings with mainline railroads.

 

Over the past four years, FTA's annual reporting process has collected rail grade crossing accident data.  These data reveal declines in rail grade crossing accident rates, injury rates, and fatality rates.  The graph to the right illustrates these decreasing rates. Rail grade crossing injury rates have decreased by 30% and rail grade crossing fatality rates have fallen by 80% over the past four years.

 

FTA appreciates this unique safety concern and continues to structure programs and provide technical assistance to assist the industry in the prevention, mitigation and management of light rail accidents, including those occurring at rail grade crossings. 

 

Rail Grade Crossings: 1999 - 2002

rail grade crossings: 1999 - 2002

(per 10M passenger trips)

 

 

Internal Safety Audit Process

  

 

Basic Overview

 

The Internal Safety Audit Process is a series of ongoing audits that evaluate and document an agency's performance of key safety functions specified in the System Safety Program Plan (SSPP).  The ISAP is an effective means for a rail system to demonstrate to the state oversight agency and its own top management the effectiveness of the implementation of its SSPP.  This process provides an opportunity to proactively identify areas for improving critical elements of the transit agency's transit safety program and SSPP.  ISAP

 

Agencies implement a variety of different options in establishing audit responsibility.  For example a Safety Department, Operations Department, or a specifically selected Audit Team may carry out the audits.  Both FTA and APTA recommend that auditors be independent from first line of supervision responsible for the activity being audited.

 

The audit process should use checklists to support reviews and interviews that auditors conduct.  Aside from being an auditor's tool, checklists also help to define the role of an auditor and to ensure the objective review of safety activity.  Checklists should be developed in advance of an audit using the SSPP as guidance.  The final checklist should be easy to complete and completed checklists should be easy to understand.

 

Important to the audit process is the planning of the audit.  Critical elements to be audited should be identified and auditors should coordinate with the appropriate departments and present documentation requirements upfront. 

 

 

  Common Checklist Components

          Date

          Department

          Department Contact

          Auditors

          Reference Criteria

          SSPP

          Standard Operating Procedures

          Training Manuals

          Maintenance Procedures

          Method of Verification

          Conduct Interviews

          Review/Evaluate Procedures and Records

          Equipment Inspection

          Observation of Operations and Maintenance Productivity

          Result/Comments

          Recommendations/Corrective Action

          Implementation Schedule

 

 

Results from audits should be appropriately documented and verified.  The auditing group should provide results to appropriate levels of management.  Result presentation is accomplished through meetings and briefings.  An administrative process should be in place to address disagreements should they arise.

 

During the corrective action phase, or follow-up phase, actions are taken to address deficient areas.   An implementation schedule should be developed and approved by management.  Agencies track the corrective actions to ensure compliance and submit this data as part of its Annual Report.

 

Regulation

 

49 CFR Part 659.35 directs State Oversight Agencies to require applicable transit agencies to submit Annual Audit Reports.  Transit agencies should report their ISAP findings annually or as agreed to with the state.

 

 § 659.35 Transit Agency Annual Audit Reports

The oversight agency must-

(a) Require that the transit agency submit, annually, a copy of the annual safety audit report prepared by the transit agency as a result of the Internal Safety Audit Process (APTA Guidelines, checklist number 9): and

(b) Review the annual safety audit reports prepared by the transit agency.

 

 

Internal Safety Audit Process: Best Practices


 

RTD and Colorado PUC: Joint Safety Audit Process

 

The Regional Transportation District of Denver (RTD) and the Colorado Public Utilities Commission (CoPUC) have jointly developed a unique safety audit program that fosters efficient and comprehensive audits and has helped to ensure a high level of passenger safety aboard RTD vehicles.

RTD

 

Before the implementation of the joint audit process, the CoPUC had established a triennial review process similar to the model used by the California Public Utilities Commission and the RTD was executing a separate program.  As a result of an FTA audit of the State Safety Oversight activities in Colorado and the cooperation that took place between the involved parties, the CoPUC and RTD developed the idea for the joint audit process.

 

The CoPUC and RTD held a series of meetings to outline issues and discuss concerns with the proposed program concept.  The group tackled the specifics of the program; responsibilities and procedures for the creation of checklists, the conduct of audits, and report generation were established with input from both the CoPUC and RTD.

 

Assuring audit program independence as well as the validity of a final report and the creation of an audit team were key stepping stones of the program development process.  The accepted procedure was drafted by the CoPUC and adopted by RTD as the agency's Internal Safety Audit Plan.  The completed program utilizes five to six semiannual audits over a three-year audit period.  Prior to an audit, the joint process establishes two pre-audit meetings.  In the first meeting, the designated audit team develops checklist criteria for the audit.  The second meeting takes place between the audit team and the audit contacts. Following the audit process of discussion, review, documentation, observation, inspection, and measurement, a closing meeting is held at which a draft audit report and recommendations are presented by the audit team.

 

Key Benefits of the Joint Program  

·         Efficient use of limited resources

·         Allows a more comprehensive program

·         Oversight Agency involvement at all levels

·         Multi-perspective audit team

·         Meets oversight agency & transit agency regulatory requirements

·         Promotes a cooperative working relationship

·         Improves safety

 

Audited departments are given a 30-day response period to implement Corrective Action Plans (CAPs) and overturn findings of deficiency.  If both agencies sign off on the CAPs, then a joint final report is issued, but in the case of disagreement between the agencies, separate final reports are issued.  Following the reports, the CoPUC receives quarterly updates on all active CAPs.


 

 

BART and California PUC:

Focus on Skill and Expertise

 

BARTsubway train

 

The Bay Area Rapid Transit (BART) Internal Safety Audit Program (ISAP) was developed with great emphasis on auditors' skill sets.  This focus was made to ensure credible checklists, proper groundwork with audited departments, professional implementation, and appropriate follow-up on corrective actions.

 

BART used the California Public Utilities Commission (CPUC) Audit Program as a model for their program.  The program encourages coordination with the CPUC; a designated representative participates in the audit process and an annual audit report is presented to the Oversight Agency.  The process establishes a Management Procedure that is signed by the agency's General Manager to provide justification, identify affected departments, and outline responsibilities of involved parties.

 

Using the American Public Transportation Association's (APTA) Safety Audit Program list of elements, BART developed a global list of all audit subject areas, activities, and functions involved in the audit process.  All audit activities are covered within a three-year cycle with the third year also including the CPUC triennial review.

 

The audit team development process used at BART assures that roles for team members, such as Team Leader, Audit Administrator, and Field Auditors, are clearly defined.  BART provides the audit team with training on the audit process and the systems being audited.  The team is a dedicated, independent group and the Audit Program is a key responsibility for each member of the team and is part of each member's performance evaluation. 



 

BART ISAP Key Aspects

·        Oversight Agency Coordination

·        Audit Team Development

·        Training

·        Communications with Audited Departments

·        Documentation

·        Professional Implementation


An aspect of audit team training that BART places emphasis on is the professional implementation of audit activities.  By utilizing strong personal skills such as courtesy, clear verbal communication, and the ability to deal with difficult individuals, auditors are able to ensure a smooth and helpful experience for all participants.  Proper preparation and review, interviews with managers, detailed observation, clear documentation, and fair evaluations serve to create a thorough and professional audit experience. 

 

The BART program also places emphasis on the communication between the audit team and the audited department.  Important is pre-audit planning with the appropriate managers, including a pre-audit distribution of audit checklists and the scheduling of a mutually agreeable audit time.  Findings are to be discussed with the appropriate manager upon the completion of the audit and a draft copy of the completed audit checklist is presented in order to eliminate any surprises for the audited department.

 

TheBART ISAP also emphasizes the importance of corrective action follow-up.  One of the most difficult phases of the audit process, corrective action management requires the commitment and support of the appropriate department within the transit agency organization.  BART requires periodic reports to track the progress of corrective action plans.  The reports identify the specific responsibilities assigned for the completion of corrective actions.

 

Shared Corridor Safety: FRA Waiver Process

 

In June of 2000 the Federal Transit Administration (FTA) and the Federal Railroad Administration (FRA) issued a "Joint Statement of Agency Policy" with regard to the shared use of the tracks of the general railroad system by urban mass transit systems.  Subsequently, FRA issued a "Statement of Agency Policy Concerning Jurisdiction" that established a process wherein the FTA would serve as a nonvoting member of the FRA's Railroad Safety Board.  The Board considers and acts upon shared track and shared corridor waiver petitions addressed by the FTA/FRA Joint Policy and FRA Agency Policy.

 

When a transit agency ("grantee petitioner") submits a waiver petition to the FRA, a notice is published in the Federal Register.  The notice describes the petition, invites public and/or other interested parties' comments and establishes a comment period (usually 45 days).  The petition is sent to the FRA's respective regional office for investigation and recommendations.  This is followed by review and decision by the FRA Railroad Safety Board in conjunction with FTA's representative.  FRA's interaction with the grantee petitioner is primarily on the local level. 

 

Pending Waivers Online

  • http://dms.dot.gov/reports/fr.htm

 

 

In response to the State Safety Oversight Community's request that safety officials be notified when a transit agency petitions for waiver, FTA is implementing an informal procedure to request safety oversight official notification. Upon receipt of a transit agency's waiver petition, FTA requests that the petitioner provide a copy of their FRA waiver petition to oversight officials.  This will initiate early dialogue with the transit agency.  A copy of the Federal Register notice will also be mailed to officials so that comments may be made for the record, as provided for in that notice.  FRA's Safety Board will consider all state safety oversight agency observations in making their final decision with respect to any shared use waivers.

 

SSO Community Contact

 

FTA Regional Administrators:

 

FTA Region 1

Richard Doyle
Kendall Square

55 Broadway
Cambridge, MA 02142

Phone: (617) 494-2055

Fax: (617) 494-2865

richard.doyle@fta.dot.gov

 

FTA Region 2

Letitia Thompson
One Bowling Green
Room 429
New York, NY 10004-1415

Phone: (212) 668-2170

Fax: (212) 668-2136

letitia.thompson@fta.dot.gov

 

FTA Region 3

Herman Shipman
1760 Market Street

Suite500
Philadelphia, PA 19103

Phone: (215) 656-7100

Fax: (215) 656-7260

herman.shipman@fta.dot.gov

 

FTA Region 4

JerryFranklin
Atlanta Federal Center

Suite17150
61 Forsyth Street, SW
Atlanta, GA 30303

Phone: (404) 562-3500

Fax: (404) 562-3505

jerry.franklin@fta.dot.gov

 

FTA Region 5

Joel Ettinger
200 West Adams

Suite320
Chicago, IL  60606

Phone: (312) 353-2789

Fax: (312) 886-0351

joel.ettinger@fta.dot.gov

 

FTA Region 6

Robert Patrick
819 Taylor Street
Room 8A36
Fort Worth, TX 76102

Phone: (817) 978-0550

Fax: (817) 978-0575

robert.patrick@fta.dot.gov


F
TA Region 7

Mokhtee Ahmad
901 Locust Street
Suite 404
Kansas City, MO 64106

Phone: (816) 329-3920

Fax: (816) 329-3921

mokhtee.ahmad@fta.dot.gov

 

FTA Region 8

Lee Waddleton
Columbine Place
216 16th Street, Suite 650
Denver, CO 80202-5120

Phone: (303) 844-6775

Fax: (303) 844-4217

lee.waddleton@fta.dot.gov

 

FTA Region 9

Leslie Rogers
201 Mission Street
Room 2210
San Francisco, CA 94105

Phone: (415) 744-3133

Fax: (415) 744-2726 leslie.rogers@fta.dot.gov

 

FTA Region 10

RichardF. Krochalis
Jackson Federal Building

915 Second Ave,

Suite3142
Seattle, WA 98174-1002

Phone: (206) 220-7957

Fax: (206) 220-7959

rick.krochalis@fta.dot.gov

 

State Oversight Agencies:

 

Arizona Department of Transportation

Bill Sapper
206 South 17th Ave
Maildrop 310B
Phoenix, AZ 85007

Phone: (602) 712-7465

bsapper@dot.state.az.us

 

Arkansas State Highway & Transportation Department

David Lumbert
10324 Interstate 30
P.O. Box 2261
Little Rock, AR 72203

Phone: (501) 569-2559

Fax: (501) 569-2476

david.lumbert@ahtd.state.ar.us

 

CaliforniaPublic Utilities Commission

Robert Strauss
505 Van Ness Avenue, 2nd Floor
San Francisco, CA 94102

Phone: (415) 703-3206

Fax: (415) 703-1910

rls@cpuc.ca.gov

 

ColoradoPublic Utilities Commission

Ray Jantzen
1580 Logan Street, OL 3
Denver, CO 80203

Phone: (303) 894-2849

jack.baier@dora.state.co.us

 

Florida Department of Transportation

Mike Johnson
Transit Office
605 Suwannee Street, MS-26
Tallahassee, FL 32399

Phone: (850) 414-4525

Fax: (850) 922-4942

jamesmike.johnson@dot.state.fl.us

 

GeorgiaDepartmentof Transportation

Steven Kish
276 Memorial Drive, SW
Atlanta, GA 30303-3743

Phone: (404) 651-9210

Fax: (404) 657-4221

steve.kish@dot.state.ga.us

 

Louisiana Department of Transportation & Development

Carol Cranshaw
P. O. Box 94245
Baton Rouge, LA 70804-9245

Phone: (225) 274-4361
Fax: (225) 274-4314

ccranshaw@norta.com

 

Maryland Department of Transportation

John Contestabile
7201 Corporate Center Drive
P.O. Box 548
Hanover, MD 21076

Phone: (410) 865-1120

Fax: (410) 865-1388

jcontestabile@mdot.state.md.us


M
assachusetts Department of Telecommunications & Energy

Brian Cristy
One South Station, 2nd Floor
Boston, MA 02110

Phone: (617) 305-3770

Fax: (647) 478-2598

brian.cristy@state.ma.us

 

Michigan Department of Consumer & Industry Service

James Gordon
CIS-GI
P.O Box 30644
Lansing, MI 48909-5144

Phone: (517) 322-1831

jgordo@michigan.gov

 

Minnesota Department of Public Safety

Major Kent O'Grady
444 Cedar St., Suite 130
St Paul, MN 55101-5130

Phone: (651) 282-6403

Fax: (651) 296-5937

kent.ogrady@state.mn.us

 

Missouri Department of Transportation

Robert Kraus
2217 St. Mary's Blvd.
P. O. Box 270
Jefferson City, MO  65102

Phone: (573) 751-7124

Fax: (575) 526-2170

krausr1@mail.modot.state.mo.us

 

Nevada Department of Transportation

James Mallery

1263 South Stewart Street
Carson City, NV  89712

Phone: (775) 888-7464
Fax: (775) 888-7207

jmallery@dot.state.nv.us

 

New Jersey Department of Transportation

BobSedlock
StateSafety Oversight
225 E. State Street, 4E
Box 177
Trenton, NJ 08666-0177

Phone: (609) 292-6893

Fax: (609) 633-9367

bobsedlock@dot.state.nj.us
 

New YorkPublic Transportation Safety Board

Jerry Shook
Passenger & Freight Division
1220 Washington Avenue
Bldg 7A, Room 630
Albany, NY 12232-

Phone: (518) 457-6500

Fax: (518) 457-4637

jshook@gw.dot.state.ny.us

 

North Carolina Department of Transportation, Rail Division

George Young

1556 Mail Service Center
Raleigh, NC 27699-1556

Phone: (919) 715-8742

Fax: (919) 715-8704

gyoung@dot.state.nc.us

 

Ohio Department of Transportation

Dave Seech
Office of Transit, 2nd Floor
1980 West Broad Street
Columbus, OH 43223

Phone: (614) 466-9515

Fax: (614) 466-0822

dave.seech@dot.state.oh.us

 

Oregon Department of Transportation

Kofi Kyei
123 NW Flanders
Portland, OR 97209

Phone: (503) 731-4835

Fax: (503) 731-8531

kofi.o.kyei@odot.state.or.us

Pennsylvania Department of Transportation

David Barber
Bureau of Public Transportation, 400 North St., 6th Floor
PO Box 3151
Harrisburg, PA 17105-3151

Phone: (717) 787-1207

Fax: (717) 772-2985

dabarber@state.pa.us

 

Puerto Rico State Emergency and Disaster Management Agency

Rafael Guzman

Eleanor Roosevelt St.,

No. 215
Hato Rey, PR 00918

Phone: (787) 721-3596

rguzman@aemead.gobierno.pr

 

Regional Transit Authority

Duana Love
175 West Jackson St.
Suite 1550
Chicago, IL 60604

Phone: (312) 913-3248

Fax: (312) 913-3206

loved@rtachicago.org

 

St. Clair County Transit District

Bill Grogan
1004 South Lincoln Ave

Suite1
O'Fallon, IL 62269

Phone: (618) 628-8090

Fax: (618) 628-7820

bgrogan@scctd.org

Tennessee Department of Transportation

Jim Ladieu
Suite 1800 J.K. Polk Building
505 Deaderick Street
Nashville, TN 37243

Phone: (615) 253-1042

Fax: (615) 253-1482

jim.ladieu@state.tn.us

 

Texas Department of Transportation

Susan Hausmann
Public Transportation Division
125 East 11th Street
Austin, TX 78701

Phone: (512) 416-2833

Fax: (512) 416-2830

shausman@dot.state.tx.us

 

Tri-State Oversight Committee

Natalie Jones
Reeves Municipal Building
2000 14th Street, 5th Floor
Washington, DC 20009

Phone: (202) 671-0539

Fax: (202) 671-0650

natalie.jones@dc.gov

 

Utah Department of Transportation

Eric Cheng
4501 South 2700 West
Box 143200
Salt Lake City, UT 84114-3200

Phone: (801) 965-4284

Fax: (801) 965-4736

echeng@utah.gov

Virginia Department of Rail and Public Transportation

Karen Rae
1313 East Main St.
Suite 300
Richmond, VA 23219

Phone: (804) 786-1051

Fax: (804) 225-3664

krae@drpt.state.va.us

 

Washington State Department of Transportation

JeffSchultz
Public Transportation & Rail Division
Transportation Building

PO Box 47387
Olympia, WA 98504-7387

Phone: (360) 705-7981

Fax: (360) 705-6821

schultj@wsdot.wa.gov

 

Wisconsin Department of Transportation

John Etzler
PO Box 7913
4802 Sheboygan Ave.
Madison, WI 53707-7913

Phone: (608) 266-9637

Fax: (608) 266-0658

john.etzler@dot.state.wi.us